Day 23. Sheetrocking continues.
Day 24. Electrical work. Running new wires from the electrical panels to the bathroom is not included in the original scope of work (Even though I knew it was going to need to be done.) So here's an additional $600 of labor and materials. There's reverse polarity in many of my outlets. As long as the floor to the basement was exposed, it made sense to correct this in the bathroom (see link on reverse polarity.) In addition, I'm probably going to add to the scope of work by having electrical circuits pulled into the upstairs (our bedroom) as the ceiling is also accessable right now.
After tonight's portion of electrical was completed, there was more sheetrocking, as you can see, most of the sheet rock on the two walls has been completed. I wanted you to be able to see the pond right from the window in the shower (second picture.)
98 hours of labor (just under $5400)plus $600 in electrical plus ($1500) spent on the materials. A total of $7500. I anticipate this going to about $12000 at the end of the project.
No comments:
Post a Comment